- Author: Sean D Hogan
In the past year IGIS has had the pleasure to work with Juniper Unmanned inc. to undertake a proof of concept project interested in mapping cellular broadband speeds at four agricultural sites in the rural Central Valley of California, using a drone equipped to spatially record cellular network speeds for ATT, Verizon and T-Mobile cell phone carriers. Information of this type may be useful for future smart-farming efforts, including allocations of resources and the potential placement of cellular antennas on farms in the future.
For more information, please see the following StoryMap, which reports the project's findings: https://storymaps.arcgis.com/stories/d1f34c829c104c9d9bb0ed4536f39e03
- Author: Andy Lyons
- Contributor: Suzanne Morikawa
Access to fast internet isn't just a luxury anymore. In our modern age, broadband is a necessity to take advantage of all kinds of basic services, from education, to banking, civic engagement, navigation, and even health care. Most broadband in the USA is provided by Internet Service Providers companies (ISPs), and while we're getting closer to universal coverage there is still a ways to go!
Broadband Mapping
California was an early pioneer in broadband mapping, to show exactly where broadband is available and where it isn't. For the past 10 years, the Federal Communication Commission (FCC) has been collecting broadband data from ISPs for the entire country, and putting it on a national map. Actually there are two maps - one for fixed internet access points (i.e., homes and businesses), and one for mobile broadband. The latest version of the national broadband map was released in late November, and the FCC is now inviting the public to submit feedback through January 13, 2023.
Although ISPs are the primary sources of data, the FCC encourages everyone to check out the map. If the reported availability and speeds don't seem to tally with your experiences, they've also made it easy to submit feedback, known as ‘challenges'. And indeed thousands of citizens have been doing exactly this.
What does this have to do with me?
Exploring the National Broadband Map can be fun and is definitely educational - especially this year where the level of granularity is higher than ever. You can see which ISPs are serving your area, and what kind of connection speeds they claim.
But the map isn't simply for public information. The map with all the feedback submitted is also being used to identify where internet infrastructure investments are needed most to achieve the ultimate goal of universal access. And if you've been following the news recently, there's a lot of funding coming out of Washington and Sacramento right now to improve digital infrastructure.
Aside from helping steer resources where they're needed most, if you decide to contribute data to the national broadband map, you'll be joining one of the largest citizen science projects in the country. Thousands of residents just like yourself have used the mobile app and other tools provided by FCC to check their actual internet speed. And if you discover the claims by the ISPs are perhaps a bit rosy, you have the option to submit feedback in the form of 'challenge' data.
How do I participate?
The map is designed for the public. You can use it to see what internet service is available in your area, and the expected speeds. If you still want to keep going, you can double-check your cellular internet speed outside or while driving using a phone app. If you find any discrepancies on either the mobile or fixed broadband maps, you can submit feedback through the website or the mobile app. If enough people submit similar feedback from your area, the FCC will ask the ISPs to explain themselves, and either update the map or improve service.
First things first is to simply visit the map and find your area. You can type in an address or the name of a city (then wait a second for the drop down box to update), or use the pan and zoom controls to find your area. Once you've found your area, remember there are two maps to look at. The fixed internet map (with the green dots) will probably include your house if any ISPs offer service in your area (whether or not you use their service). The mobile broadband map shows the expected cellular internet speed using hexagons that get smaller as you zoom in.
Click on the map to see what it says about your upload and download speed. Internet speeds are measured in megabytes per second (Mbps), and to qualify as 'broadband' the ISP must offer at least 25 Mbps for download and 3 Mbps for upload (that definition may soon be changing). Remember that the reported speeds are provided by the ISPs, and may or may not be what you actually experience.
Verify your mobile data speed
Want to keep going? Let's start by looking at how you can test your mobile (cellular) internet speed, and if you desire how to report what you actually experience.
To measure the actual connection speed you're getting on your phone or mobile device, you can download the 'FCC Speed Test' app (available for Android and iOS). A few caveats about using the mobile app:
- The whole point of the mobile app is to test the speed of mobile broadband. This means:
1) you need to disconnect from WiFi when you use the app to test connection speeds, and
2) testing is going to eat into your cell phone data usage. Many cell phone plans come with unlimited mobile data, in which case this may not be a big deal. But others give you a monthly quota, after which they slow down, cut off, and/or charge you more. When you install the app, you'll be asked how much data to allow it to use within your monthly billing cycle, from 500 MB up to 10 GB. - Sharing your data with the FCC is optional. If you just want to use the mobile app to see your connection speed, you can opt-out of sharing data and skip entering your name and email.
- The app does however require permission to access your location to run a test, even if you're not sharing the data. If this makes you nervous, there are other apps you can use to check your internet speed that don't ask for your location.
- The national mobile broadband map reports connection speeds outside. The FCC isn't particularly interested in how fast your cell phone data is inside your house, which of course is affected by all kinds of other things starting with how thick your walls are. You can use the app anywhere, but to submit data to the FCC make sure you step outside or go for a drive.
- Depending where you live, you may have noticed that internet speeds vary throughout the day. For example, when a lot of people stream video during prime time, individual speeds may go down. The FCC wants to know about that also. The app has an option to run tests periodically in the background. If you choose to enable this, it will still stay within the overall monthly cap you specified when installing the app.
Provide feedback on the fixed broadband map
The feedback the FCC wants on the fixed broadband map is a little different. Like the mobile app, they're interested in hearing if your internet speed is significantly different from what the ISPs report. But more fundamentally they're interested in whether the ISP service is actually available in practice. If you've tried to order service but the ISP never replied, or asked for an excessive installation fee, the FCC wants to know about that. They also want to know if your address is mislocated on the map, or in some cases missing completely!
To submit a challenge about the availability of service or the accuracy of a location, you essentially complete a web form. Click on the location on the map, and then either the ‘availability challenge' or ‘location challenge' links. For a preview of what that looks like, see this YouTube tutorial.
What about affordability?
We all know that ‘availability' only translates to ‘accessibility' if the service is affordable. For better or worse, the FCC national broadband map does not attempt to capture affordability. You can (and should) use the 'Availability Challenge' link to report if the installation fee for fixed broadband is excessive. However beyond that, the national map may not be the best place to register a complaint about broadband affordability.
Work with your community
While the FCC has made it easy to submit challenges to the map, that doesn't mean it will ask the ISPs to respond to every single submission. They need to see several challenges for the same area before they will aggregate them and ask the ISP to respond. So if you really feel the map needs to be reality-checked, encourage your neighbors and community to get involved. You will get feedback if your challenge is aggregated and sent to an ISP. Plus you never know, your efforts may just lead to an update on the map, with upgrades to infrastructure and service to follow!
/h3>/h3>/h3>/h3>/h3>/h3>/h3>
- Author: Jeannette E. Warnert
Even as the digital revolution has changed the world, there are thousands of California residents in rural areas that do not have an internet connection adequate for engaging in modern technology.
With offices in all California counties and several research centers located in remote locations, UC Agriculture and Natural Resources Vice President Glenda Humiston and UC ANR Chief Innovation Officer Gabe Youtsey believe UC ANR is in a position to forge partnerships with government, industry, and other academic organizations to connect rural Californians with high-speed internet.
Youtsey testified at a rural broadband informational hearing in Sacramento on Aug. 28 held by the Assembly Select Committee on Economic Development and Investment in Rural California, chaired by Rep. Anna Caballero (D-Salinas), and the Communications and Conveyance Committee, chaired by Rep. Miguel Santiago (D-Los Angeles.)
In his testimony, Youtsey characterized the presence of UC ANR in California for the lawmakers.
“We are a network, not a place,” he said. “We have more than 1,500 very applied academics; I call them academics with muddy boots because our job is really to turn science into on-the-ground solutions.”
While it is potentially expensive to bring broadband internet connectivity to every resident of California – from the far reaches of Modoc County in the north to remote desert communities near the Mexican border in the south – those communities' lack of high-speed internet is also exacting a high medical, social, and educational cost.
“High-speed connectivity is needed in rural communities not just for entertainment,” Youtsey said. “It's about online education, medical care, banking and businesses. Digital inclusion is an issue of economic justice.”
Youtsey likens the spread of broadband internet to a successful initiative in the 1930s to promote rural electrification in the U.S. The program was managed by the U.S. Rural Electrification Administration, one of the agencies created under the New Deal, President Franklin Roosevelt's sweeping legislation that helped lift the United States out of the Great Depression.
The government's role in “internetification” could be an investment in infrastructure, Youtsey said.
“It is very expensive to bring wired internet connectivity to places where it has never been before,” Youtsey said at the hearing.
At one UC ANR location, the UC Sierra Foothills Research and Extension Center, laying a wired connection was cost prohibitive.
“The internet provider had to beam a signal from Marysville, up to the top of the Sutter Buttes, and then beam 26 miles across the valley to our location. That was about a $150,000 one-time set-up cost. That's just not realistic in many cases,” he said.
Youtsey said UC ANR would like to leverage its remote locations as launch points for public-private partnerships for rural broadband, a plan that dovetails an initiative now being considered by state legislators.
Assembly Member Eduardo Garcia (D-Coachella) has introduced AB 1665, known as the Internet for All Now bill, which aims to ensure social and economic equity for all Californians in the digital age. This bill would approve funding by Dec, 31, 2022, for infrastructure projects that would provide broadband access to no less than 98 percent of California households.
“We support passage of the bill, but we're not going to stand still,” Youtsey said.
Already, UC ANR is creating partnerships with rural communities to provide shared internet connectivity. One project underway is located at the UC Kearney Agricultural Research and Extension Centernear Parlier, a 15,000-resident community in rural southeast Fresno County that has one of the state's highest percentages of Latinos. After connecting the center with fast one-gigabit speeds, UC ANR is planning to outfit all 330 acres with outdoor wireless coverage to support research and innovation. The next step will be to pilot a public-private partnership with the local community to work with the center and a vendor to share costs and make affordable broadband upgrades for both the residents in the community and UC researchers.
Another project is located at the UC Lindcove Research and Extension Center at the eastern edge of the San Joaquin Valley near Exeter, an agricultural city of 10,000 near the Sierra Nevada foothills.
“We don't have this site lit up yet. We're working hard on beaming a signal from Visalia, 25 miles away,” Youtsey said. “Once we have it here, we're in the heart of the state's citrus region. We're surrounded by commercial citrus farmers who all struggle immensely with getting broadband. We hope to be part of the solution.”
- Author: Jeannette E. Warnert
Even as the digital revolution has changed the world, there are thousands of California residents in rural areas that do not have an internet connection adequate for engaging in modern technology.
With offices in all California counties and several research centers located in remote locations, UC Agriculture and Natural Resources Vice President Glenda Humiston and UC ANR Chief Innovation Officer Gabe Youtsey believe UC ANR is in a position to forge partnerships with government, industry, and other academic organizations to connect rural Californians with high-speed internet.
Youtsey testified at a rural broadband informational hearing in Sacramento on Aug. 28 held by the Assembly Select Committee on Economic Development and Investment in Rural California, chaired by Rep. Anna Caballero (D-Salinas), and the Communications and Conveyance Committee, chaired by Rep. Miguel Santiago (D-Los Angeles.)
In his testimony, Youtsey characterized the presence of UC ANR in California for the lawmakers.
“We are a network, not a place,” he said. “We have more than 1,500 very applied academics; I call them academics with muddy boots because our job is really to turn science into on-the-ground solutions.”
While it is potentially expensive to bring broadband internet connectivity to every resident of California – from the far reaches of Modoc County in the north to remote desert communities near the Mexican border in the south – those communities' lack of high-speed internet is also exacting a high medical, social, and educational cost.
“High-speed connectivity is needed in rural communities not just for entertainment,” Youtsey said. “It's about online education, medical care, banking and businesses. Digital inclusion is an issue of economic justice.”
Youtsey likens the spread of broadband internet to a successful initiative in the 1930s to promote rural electrification in the U.S. The program was managed by the U.S. Rural Electrification Administration, one of the agencies created under the New Deal, President Franklin Roosevelt's sweeping legislation that helped lift the United States out of the Great Depression.
The government's role in “internetification” could be an investment in infrastructure, Youtsey said.
“It is very expensive to bring wired internet connectivity to places where it has never been before,” Youtsey said at the hearing.
At one UC ANR location, the UC Sierra Foothills Research and Extension Center, laying a wired connection was cost prohibitive.
“The internet provider had to beam a signal from Marysville, up to the top of the Sutter Buttes, and then beam 26 miles across the valley to our location. That was about a $150,000 one-time set-up cost. That's just not realistic in many cases,” he said.
Youtsey said UC ANR would like to leverage its remote locations as launch points for public-private partnerships for rural broadband, a plan that dovetails an initiative now being considered by state legislators.
Assembly Member Eduardo Garcia (D-Coachella) has introduced AB 1665, known as the Internet for All Now bill, which aims to ensure social and economic equity for all Californians in the digital age. This bill would approve funding by Dec, 31, 2022, for infrastructure projects that would provide broadband access to no less than 98 percent of California households.
“We support passage of the bill, but we're not going to stand still,” Youtsey said.
Already, UC ANR is creating partnerships with rural communities to provide shared internet connectivity. One project underway is located at the UC Kearney Agricultural Research and Extension Centernear Parlier, a 15,000-resident community in rural southeast Fresno County that has one of the state's highest percentages of Latinos. After connecting the center with fast one-gigabit speeds, UC ANR is planning to outfit all 330 acres with outdoor wireless coverage to support research and innovation. The next step will be to pilot a public-private partnership with the local community to work with the center and a vendor to share costs and make affordable broadband upgrades for both the residents in the community and UC researchers.
Another project is located at the UC Lindcove Research and Extension Center at the eastern edge of the San Joaquin Valley near Exeter, an agricultural city of 10,000 near the Sierra Nevada foothills.
“We don't have this site lit up yet. We're working hard on beaming a signal from Visalia, 25 miles away,” Youtsey said. “Once we have it here, we're in the heart of the state's citrus region. We're surrounded by commercial citrus farmers who all struggle immensely with getting broadband. We hope to be part of the solution.”
ANR's Network Project has officially kicked off, according to Gabe Youtsey, chief information officer. The multimillion-dollar investment will bring to county offices and research and extension centers Internet speeds that are hundreds of times faster than what they currently have, as well as better wireless coverage and modern cabling to many locations.
This will provide a host of new possibilities for ANR including ag tech and big data research, modern cloud-based technology tools and new phone/web/video conferencing capabilities.
“We have a lot of work to do to prepare for and complete this project including equipment upgrades, construction and electrical work and finding new service providers to partner with,” said Youtsey.
In order to complete this complex, important project, ANR IT has partnered with ANR Facilities Planning and Management, the Corporation for Education Initiatives in California (CENIC) and Dimension Data.
“We are currently developing our comprehensive project plan, and my hope is that we can have every UC ANR location upgraded by the end of FY 2017, if not sooner,” Youtsey said.
The REC and UCCE locations planned for upgraded in the first phase are:
◦ Desert REC
◦ Intermountain REC
◦ Kearney Ag REC
◦ Sierra Foothill REC
◦ West Side REC
◦ UCCE Colusa
◦ UCCE Central Sierra MCP (El Dorado office)
◦ UCCE Humboldt
◦ UCCE Imperial
◦ UCCE Inyo-Mono
◦ UCCE Los Angeles
◦ UCCE Madera
◦ UCCE Monterey
◦ UCCE Nevada
◦ UCCE Riverside (Moreno Valley Office)
◦ UCCE San Bernardino
◦ UCCE San Joaquin
◦ UCCE Stanislaus
◦ UCCE Sutter-Yuba
◦ UCCE Yolo
“While these locations are planned for our first phase, we will be creating upgrade plans very soon for the remaining UC ANR locations planned for phase 2, which we hope to begin work in late summer or early fall 2016,” Youtsey said. “Our project team will reach out to offices directly to begin the process, and we will send out regular communications on the progress of the project. You can reach our project team anytime with questions at networkproject@ucanr.edu.”