ANR Employees
University of California
ANR Employees

ANR 2nd St Building now open

Power has been restored to the 2nd Street Building in Davis and it is fully operational. If you are planning to work at the ANR Building, you may do so.

2nd Street is closed currently to all traffic for a section of road west of our office, between L St and Cantrill Drive. It is not known how long this closure will remain in effect. However, the ANR Building is accessible from 2nd Street from the east (coming from the Mace Blvd exit off I-80) and from Pena Drive.

Rainy conditions are predicted to continue throughout the week, but hopefully we have gotten through the worst of it.

Stay safe and dry and follow these winter storm preparedness tips: https://ucanr.edu/sites/safety/files/378115.pdf.

Brian Oatman
Director, Risk & Safety Services

 

Posted on Tuesday, January 10, 2023 at 12:26 PM
Tags: Safety (10)

Read more

 
E-mail
 
Webmaster Email: lforbes@ucanr.edu