UC President Michael V. Drake will hold a systemwide UC Town Hall on Feb. 24 from 11:30 a.m. to 12:30 p.m. (PT). President Drake will share opening remarks, then engage in conversation with Priya Lakireddy and Jo Mackness, staff advisor and staff advisor-designate to the UC Regents.
Power has been restored to the 2nd Street Building in Davis and it is fully operational. If you are planning to work at the ANR Building, you may do so. 2nd Street is closed currently to all traffic for a section of road west of our office, between L St and Cantrill Drive.
To all UC ANR colleagues: Recent storms have knocked out power at 2801 2nd Street in Davis and 2nd Street is currently closed to all traffic. PG&E estimates that power will be out at the UC ANR office all day on Monday, Jan. 9, with an estimated restoration time of 11 p.m. on Jan. 9.