Table 5. HOURLY EQUIPMENT COSTS TO PRODUCE CHILI PEPPER
Coachella Valley-1995/1996

HOURLY EQUIPMENT COSTS TO PRODUCE CHILI PEPPER
 COSTS PER HOUR 
 Non-Cash OverheadCash OverheadOperating 
 Actual Hours UsedDepreciationInterestInsuranceTaxesRepairsFuel & LubeTotal Oper.Total Costs/Hr.
95 45 HP 2WD Tractor165.35.501.500.290.401.212.543.7511.44
95 65 HP 2WD Tractor3113.370.920.180.251.163.504.669.38
95 70 HP 4WD Tractor440.93.530.960.180.262.083.956.0310.96
95 Bed Shaper w/mulch1361.350.460.090.121.460.001.463.49
95 Cult - 2 Row 40"572.680.920.180.251.220.001.225.24
95 Cult - Rolling 16'347.372.510.480.682.000.002.0013.04
95 Disc - 8' Offset207.81.060.360.070.101.750.001.753.34
95 Forklift2344.6110.141.942.732.760.002.7662.18
95 Lister - 3 Row 40"571.010.340.070.090.460.000.461.98
95 Mower - Rotary 8'37.63.730.850.160.230.940.000.945.91
95 Pickup - 1/2 Ton5722.313.550.680.952.922.645.5633.05
95 Plow - 2 bot902.240.760.150.211.610.001.614.96
95 Triplane - 121024.801.640.310.441.970.001.979.16